
Soil removal
Soil and turf from landscaping, garden levelling, or digging out a patio. Loaded direct from the heap and away by the load.
Tyne and Wear
Serving NE1 · NE2 · NE3 · NE4 · NE5 · NE6 · NE7 · NE12 · NE13 · NE15
Looking for grab hire in Newcastle? Soil, rubble, hardcore, aggregates and muckaway lifted off your NE plot in a single visit, from the £120-million Forth Yards regen to the £137-million Founders Place at Stephenson Quarter.

*Same-day loading is subject to availability.
We cover grab hire and aggregates delivery across Newcastle and the surrounding NE1, NE2, NE3, NE4, NE5, NE6, NE7, NE12, NE13, and NE15 postcode districts, from the city centre and Newcastle Central Station through to Jesmond, Heaton, Byker, Walker, Fenham, Kenton, Gosforth, Elswick, and the West End. The same network reaches into Gateshead, North Shields, Whitley Bay, Cramlington, and Ponteland where access works.
Newcastle is in a heavy phase of city-centre regen. Forth Yards, described as the city's last major brownfield site, picked up £120 million of UK government funding in August 2025 to bring forward up to 2,500 homes plus public realm and commercial space. The £137-million Founders Place at Stephenson Quarter immediately south of Newcastle Central Station is delivering 160,000 square feet of new-build office space, 60,000 square feet of refurbished heritage buildings, and around 80 zero-carbon homes across the Orchard Yard and Railyards future phases. Newcastle Helix on 24 acres of the former Science Central site is home to four national innovation centres alongside SMEs, corporates, and urban living. The city-centre transformation programme has completed public-realm phase 1 at Ridley Place and Saville Row, is upgrading Grey Street with a dedicated cycle lane and rain gardens, and began Northumberland Street works in January 2024 for a summer-2025 completion. Programmes like that generate a steady run of muckaway and groundworks spoil, which is exactly what a grab lorry is built to move.
On the trade side, the Central Motorway viaduct is under £9 million of works from August 2025 as part of a wider £41.4-million programme that also includes the Tyne Bridge restoration, with 18 months of overnight lane closures on the 1,600-metre structure that carries up to 80,000 vehicles a day. Our work in Newcastle mixes new-build muckaway from the Forth Yards, Founders Place, and Newcastle Helix plots with rear extension and patio rip-outs across Jesmond, Heaton, Gosforth, and Fenham. Some Newcastle firms book this as tipper hire. That is the same chassis without the grab arm. We do both.
1 visit
Loaded direct
The lorry arrives, loads, and leaves on the same trip. No skip dropped, no chase-up.
16 t
Per grab lorry
Standard 8-wheeler grab lorry holds up to 16 tonnes. Most domestic loads fit in one visit.
0 permits
In the normal case
No road permit needed when the lorry loads from a driveway, garden, or yard.
How it works
Three steps from quote to clear site in Newcastle.
Tell us your Newcastle postcode, what you have, and the soonest you need it gone. We confirm the price, slot, and access plan, usually within the hour.
An 8-wheeler grab lorry pulls up. The hydraulic arm loads soil, rubble, hardcore, or whatever is in the heap, all in a single visit. No skip is dropped, no permit to chase.
The load goes straight to the licensed tipping point. You get back to the build, we get back to the road.
The jobs we most often clear with a grab lorry. Trade also calls it grab wagon. Tipper hire on its own is the same chassis without the grab arm. We do both.

Soil and turf from landscaping, garden levelling, or digging out a patio. Loaded direct from the heap and away by the load.

Broken brick, concrete, patio rubble, and crushed hardcore from sub-base removal. Loaded from the pile rather than wheelbarrowed into a skip.

Mixed inert spoil from foundation digs, trenches, and groundworks. Trade often calls it muckaway. The standard grab-lorry job, priced per load.

Mixed inert spoil from the £120-million Forth Yards brownfield regeneration (up to 2,500 homes) and the £137-million Founders Place mixed-use build at Stephenson Quarter south of Newcastle Central Station.
Demolition arisings and groundworks spoil from the Central Motorway viaduct works (115 bridge-deck joints on the 1,600-metre structure) and the Tyne Bridge restoration inside the £41.4-million programme.
What a grab lorry can take
Soil, rubble, hardcore, sand, gravel and aggregates. The full guide explains each one and what we will not take.
Topsoil, ballast, hardcore, sand and gravel by the load. Quoted per delivery, tipped where you need it.
Topsoil delivery
Screened, ready to spread
Tipped directly where you need it, on driveway, lawn, or site.
Quote thisSand and gravel
Building or decorative
Sharp sand, building sand, and decorative gravels by the load.
Quote thisCrushed concrete
Recycled aggregate
Recycled crushed concrete for hardstandings and access tracks.
Quote thisDecorative gravel
Finished surfaces
Bagged or loose decorative gravels for drives, paths, and borders.
Quote thisCommon questions
Yes. The same Newcastle network reaches across NE1 to NE7 plus NE12, NE13, and NE15, and out through Gateshead, North Shields, Whitley Bay, Cramlington, and Ponteland. Give us the postcode and load type and we will confirm the coverage and slot.
Yes. We work the kind of programmes running across Newcastle right now, from the £120-million Forth Yards brownfield regeneration (up to 2,500 homes) and the £137-million Founders Place at Stephenson Quarter through to Newcastle Helix on the former Science Central site and the city-centre transformation on Grey Street and Northumberland Street. Site access notes are useful upfront so we send the right vehicle for the gate width and route in.
Grab hire and tipper hire are closely related but not the same. A grab lorry is a tipper fitted with a hydraulic arm and bucket, so the driver self-loads, reaching over walls and fences where needed. A tipper on its own is the same truck without the arm, so you load it with your own machinery or labour. Grab holds up to 16 tonnes per visit, tipper around 20. We do both across Newcastle. Tell us about the site and load and we will send the right vehicle.
Most Newcastle quotes are confirmed within the hour. Next-day collection is the realistic default, and same-day is often possible if you book before mid-morning, subject to lorry availability and access at your end.
Yes. The same network delivers topsoil, ballast, hardcore, sand and gravel, crushed concrete, and decorative gravels across Newcastle and the surrounding NE area. Per-load pricing the same way, tipped where you need it.
Get in touch
Tell us your postcode and what you need clearing. We confirm coverage, pricing, and the soonest slot upfront.
Prefer to call? We’re available Mon–Fri, 7:30am–5:30pm
0333 880 0095
or fill in the form below